Project Highlights:
- The project included 50,000 square feet of new space as well as 15,000 square feet of electronic labs.
- The space is an open workspace concept with multiple options for conferencing and breakout meetings.
- Highlights include fully integrated AV throughout the conference rooms and breakout areas; a flexible cafe and training rooms with folding walls; and state-of- the-art engineering labs.
- Additionally, the team installed all new HVAC and electrical systems including a DI water system, compressed air services in labs, numerous Leibert units and a large UPS unit.