Project Highlights:

  • Phased construction of 7 floors of space that Charles River Development occupies at 7 NEEP.
  • Construction included reconfiguring the floor plan with a conference room and closed and open office space. All floors were refreshed with new flooring, furniture, painting. Core bathrooms were updated with new vanities, fixtures and tile.
  • The 4th floor became CRD’s reception and training area. Cherry wood paneling, reception desk, large training rooms, Café and stone flooring was installed to make reception floor more elegant to the public than other floors.
Quincy, MA
New York, NY
617.801.0200
info@jcalnan.com